On the afternoon of the 17th, the reporter saw in the Qingshan River Beach next to the Tianxingzhou Yangtze River Bridge that the Qingshan Beach Volleyball Sports Center of the Military Games was in full swing. The main competition venue has completed the construction of the main steel structure, and 12 supporting cabins are also basically Upon completion, the venue is in its infancy. Chaoyang Hongda Machinery Co., Ltd.
Qingshan Shapai main competition venue steel structure completed reporter Wang Qianshe
“The main competition venue of Qingshan Shapai Center is light steel structure project. The stadium is in the middle of the octagonal competition venue, and on the four sides are four grandstands that can accommodate 1116 spectators.” Han Gangping, the technical director of the construction site China Yiye, said In the four corners of the competition venue, there are also 7-meter-wide steel stairs to facilitate the audience to go up and down the stands. The connection between the four stands and the stairs is a steel structure corridor, which constitutes the steel structure of the main competition venue. "At present, the main body has been completed, and then the ground leveling, paving and greening, indoor water and electricity installation, decoration and other processes are required."
It is reported that the Qingshan Jiangtan Beach Volleyball Sports Center is designed according to one main competition venue, two warm-up venues and two training venues. It covers an area of about 42,600 square meters and is built according to the standards of the Grade A Gymnasium. The demand for the competition of 32 teams on 7 match days. The entire project is expected to be basically completed in early April next year. Chaoyang Hongda Machinery Co., Ltd.